CNMC Luanshya Copper Mines Plc (CNMC) recorded a turnover of ZMW3.39billion (US$303.19 million) for the year ended 31st March 2019 (2018: ZMW2.22 billion (US$232.1 million). The
profit after tax was ZMW366.04 million (US$32.69 million), (2018: ZMW444.81million (US$ 46.58 million)). The increase in revenue and profitability was as a result of increased production
during the year as output at Baluba and the slag reclamation project complimented production from Muliashi open pit mine.
Total 2018 copper production increased to 47,256 tonnes from 43,177 in 2017. Focus has been placed on managing the high production costs at Baluba by balancing it out with production from slag reclamation. There were no dividends declared during the year ended 31 December 2018 (2017: Nil)
Annual Report Summaries
CNMC Luanshya Copper Mines Extract from 2019 Annual Report
Previous ArticleChibuluma Mines Extract from 2019 Annual Report